Completed some misc jobs today to get ready for the full wiring install. First I enlarged the holes on each side of fuselage where all the wires and tubes from inside go through the side of the airplane to the wing root. Second install the outside air temperature probe on the inspection port on the right wing. Will be out of sunlight and exhaust in this location. Third, routed the cylinder head temp wires and the exhaust temp wires down the sides of the engine. Used adel clamps under the screw for the cylinder heads to keep them away from exhaust pipes and spark plugs.